PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Conduit for the temporary power Facing South-West (800x600).jpg Installing metal decking at Derrick -3 (2nd Floor) Facing South-West (800x600).jpg Installing rebar mats at Elev. 4-Stair -2 (3rd Floor) Facing South-West (800x600).jpg Installing rebar mats at Elev. 4-Stair 2 (3rd Floor) Facing South (800x600).jpg Installing steel columns at Derrick -3 (2nd Floor) Facing South-West (800x600).jpg Safety cables and poles at Derrick -2 (2nd Floor) Facing North (800x600).jpg Safety cables and poles at Derrick -2 (2nd Floor) Facing South (800x600).jpg Temporary Electrical panel at Elev. 1,2,3 Facing South (800x600).jpg Underground Storm sewer Facing North (800x600).jpg
Previous pageNext page Installing steel columns at Derrick -3 (2nd Floor) Facing South-West (800x600)
Installing steel columns at Derrick -3 (2nd Floor) Facing South-West (800x600)